How to quote a tiling job in Australia so you win the work and keep your margin

Mitchell Cross
By Mitchell CrossFounder, TradieBuddy AI · 22/09/2026 · 13 min read
Tradie at a kitchen bench in an Australian home, planning the day

Quoting a tiling job in Australia means measuring on site, pricing labour and materials per square metre, separating waterproofing as its own line item, and sending the quote fast. Tiling labour rates typically sit between $45 and $150 per square metre before GST1. The tilers who win more work quote quickly and follow up the ones that go quiet.

Updated 22/09/2026

Quick answer

Quoting a tiling job in Australia means measuring the area on site, pricing labour and materials per square metre with a margin that covers waste and adhesive, separating waterproofing as its own line item, and sending the quote fast. Tilers who quote same-day win more work.

Key takeaways

  • Measure on site before you price. Quoting a bathroom reno from photos leads to material shortfalls, extra cuts and margin erosion that an on-site measure prevents.
  • Tiling labour rates in Australia typically sit between $45 and $150 per square metre before GST, with most residential work in the $50 to $120 range. Wall tiling generally costs more than floor because of gravity, more cuts around fixtures and slower progress.
  • Always quote waterproofing as a separate line item. Bundling it into tiling hides a compliance-critical step and creates disputes when the scope changes.
  • Firms that tried to contact potential customers within an hour of receiving a query were nearly seven times as likely to qualify the lead. Same-day quoting wins tiling jobs.
  • Tiling is licensed in QLD (QBCC trade contractor) and NSW (wall and floor tiling contractor licence above $5,000). Other states fold tiling into broader building-work licensing at varying thresholds. Check your state before advertising as licensed.

What should a tiling quote include?

A clear, itemised tiling quote shows the customer exactly what they are paying for and reduces the disputes that eat your time. Every tiling quote should cover these items:

  • Area measured on site. Square metres of floor, walls, splashback, shower niche and any feature areas, with the measurement method noted (laser or tape).
  • Tile supply. Whether you are supplying the tiles or the customer is. If you supply, name the product, format, colour and unit cost. If the customer supplies, note you are not responsible for breakage allowance.
  • Labour rate. Per square metre or a fixed price for the defined scope. Tiling labour rates in Australia typically sit between $45 and $150 per square metre, with most residential work falling in the $50 to $120 range before GST1. Wall tiling generally costs more than floor because of gravity, more cuts around fixtures and slower progress.
  • Materials. Adhesive, grout, silicone, trims, backer board, levelling compound and a waste allowance (typically 10% for standard layouts, 15% or more for diagonal or herringbone patterns).
  • Waterproofing as a separate line. If wet-area waterproofing is in scope, quote it as its own line item with the membrane system named. Never bundle it into the tiling rate (see the waterproofing section below).
  • Exclusions. What is NOT included: demolition, rubbish removal, plumbing, electrical, painting, any structural work. A missing exclusion is a future argument.
  • Payment terms. Deposit amount, progress claims for larger jobs, final payment on completion. State the terms clearly so there is no ambiguity.
  • Licence and insurance details. Your licence number (where applicable) and confirmation of public liability cover.
Tiler pressing a large-format floor tile into adhesive in an Australian bathroom
Measuring and scoping on site is the first step to an accurate tiling quote.

How much do tilers charge per square metre in Australia?

Most residential floor tiling sits between $50 and $120 per square metre before GST. Tiling labour rates across Australia typically range from $45 to $150 per square metre before GST, with most standard residential floor tiling sitting between $50 and $120 per square metre1. The actual rate depends on the tile format, the substrate condition, the pattern and whether walls or floors are being tiled.

Factors that push rates higher:

  • Large-format tiles (600x600 mm and above). Heavier, need two-person handling on walls, require full-bed adhesive application and tighter substrate tolerances.
  • Mosaics and feature patterns. Herringbone, chevron and basketweave layouts take longer per square metre than a straight stack or brick bond.
  • Wall tiling. Gravity, more cuts around windows and fixtures, and the need for temporary support on large-format wall tiles all slow progress.
  • Substrate preparation. Uneven concrete, old adhesive removal, or backer board installation adds time before the first tile goes down.
  • Metro premium. Sydney and Melbourne rates typically run 15% to 25% above regional areas2.

For a practical comparison of quoting approaches across trades, see our tradie quoting tips guide.

Why should waterproofing always be a separate line item?

Waterproofing is the single most common source of disputes on tiling jobs, and the most common serious defect in Australian residential construction. Waterproofing is the number one serious defect in NSW Class 2 apartment buildings, accounting for 42% of serious defects in 20233.

Quoting it as a separate line item protects you in three ways:

  • Compliance visibility. Wet-area waterproofing must meet AS 3740:2021. A separate line makes it clear what membrane system you are using, where it is being applied, and that it was scoped and priced as a distinct step, not buried inside the tiling rate.
  • Scope changes. If the customer adds a niche, extends the shower, or changes the layout, the waterproofing adjustment is visible and billable. Bundled waterproofing hides variations.
  • Licensing. In QLD, waterproofing is a standalone QBCC licensed trade. In NSW, waterproofing work above $5,000 (labour and materials including GST, per NSW Fair Trading) requires a contractor licence. Waterproofing costs in Australia typically range from $40 to $110 per square metre, with most residential wet-area work sitting between $40 and $80 per square metre before GST4. If you hold the waterproofing licence, showing it as a separate line is a trust signal. If you subcontract it, the line makes the handoff clear.

For more on why waterproofing compliance is a competitive advantage, see our guide on getting more tiling jobs in Australia.

How do you actually build the cost breakdown for a tiling quote?

A profitable tiling quote starts with the site measure and works outward. Here is a step-by-step process:

  1. Measure on site. Measure every surface being tiled: floor area, each wall height and width, niches, splashbacks, window reveals. Record the substrate condition (concrete slab, cement sheet, existing tiles, timber). Never quote from photos or customer-supplied measurements alone.
  2. Calculate tile quantity. Total square metres plus waste allowance. Standard straight lay: 10% waste (assumption: industry-standard allowance for straight-lay residential tiling, directional). Diagonal, herringbone or large-format with narrow grout lines: 15% or more. If the customer supplies tiles, confirm the quantity before starting.
  3. Price materials. Adhesive (coverage per bag varies by notch size and tile format), grout, silicone, trims, movement joints, backer board or levelling compound if needed. Get supplier quotes for the specific products, do not estimate from memory.
  4. Price labour. Your rate per square metre for the specific tile format, pattern and wall or floor. Factor in travel if the job is regional. Add time for cuts around floor wastes, tap penetrations and fixtures.
  5. Add waterproofing. If in scope, price the membrane system, primer, tape and application labour as a separate line. Include the flood test if required by the certifier or council.
  6. Add overheads. Insurance, vehicle, tools and consumables, admin time, and your target margin. Healthy gross margins on residential tiling work typically sit between 25% and 40% (assumption: based on typical labour-to-materials ratios and waste factors across residential tiling job types, directional).
  7. State the exclusions. Demolition, skip bin, plumbing, electrical, painting, structural work, anything outside your scope.
Tiling tools and materials arranged on a drop sheet
Pricing materials accurately means getting supplier quotes for the specific products, not estimating from memory.

What licensing do tilers need by state?

Tiling licensing varies significantly across Australian states and territories. Here is the position for tiling and waterproofing. As NSW Fair Trading states: "You must have a contractor licence to carry out, advertise or contract for building or trade work that is valued at more than $5,000 in labour and materials (including GST)."

StateTilingWaterproofingAuthority
QLD
Licensed trade contractor (QBCC)
Standalone QBCC licence
QBCC
NSW
Contractor licence required above $5,000 (NSW Fair Trading)
Contractor licence required above $5,000 (NSW Fair Trading)
NSW Fair Trading
VIC
No standalone tiling licence; may fall under domestic builder registration above $16,000
Caught by Domestic Builder registration above $16,000 (VBA)
VBA
SA
Building Work Contractor licence
Building Work Contractor licence
CBS
WA
Generally unlicensed below $20,000 (Building Act 2011) builder threshold
Caught by Building Act above $20,000 (Building Act 2011)
Building and Energy
TAS
May require a licence when part of residential building work above $5,000 (CBOS)
Licensed above $5,000 (CBOS) for residential work
CBOS
NT
Not required by law
May require a licence for residential work above $12,000 (verify with NT Building Practitioners Board)
NT Building Practitioners Board
ACT
Typically Class D builders licence
Caught by ACT building licensing
Access Canberra

The common trap: a tiling job that includes wet-area waterproofing can cross a licensing threshold the tiling work alone would not. Scope and quote waterproofing separately so you can see when you cross the line. For a deeper look at the waterproofing component, see our guide to quoting waterproofing with a tiling job. If you advertise as "licensed" in a state where your class does not cover the work, that is a misleading representation under the Australian Consumer Law (ACL s29). For a broader look at how licensing affects quoting, see our building quoting guide.

How fast should you quote a tiling job?

Same-day quoting after the site visit is the target. A homeowner renovating a bathroom is typically getting two or three quotes. Firms that tried to contact potential customers within an hour of receiving a query were nearly seven times as likely to qualify the lead as those that tried even an hour later5.

Pre-built quote templates for common tiling jobs speed this up:

  • Standard bathroom floor and wall tile. A template with your default labour rate per square metre, adhesive and grout rates, waterproofing line, and standard exclusions. Change the measurements and tile selection, send.
  • Splashback only. Smaller scope, fixed-price template works well.
  • Full wet-area renovation. A multi-section template covering demolition allowance, waterproofing, floor tile, wall tile, niche, trims and exclusions.

Quoting software like ServiceM8 or Tradify lets you build these templates once and fill them from the van. For more on how speed affects quote conversion, see our guide on not losing quotes to faster tradies.

Tiler measuring an untiled section of a laundry floor in an Australian home
Pre-built templates let you quote from the van after the site visit.

What mistakes cost tilers money on quotes?

These are the quoting errors that erode margin or lose the job entirely:

  • Quoting from photos. A photo does not show substrate condition, fall, out-of-square walls or access issues. Every tiling quote needs a site visit.
  • Underestimating waste. Ten percent waste on a herringbone pattern is not enough. Diagonal and pattern layouts need 15% or more, and large-format tiles that break are expensive per unit.
  • Forgetting to charge for preparation. Removing old adhesive, levelling a slab, installing backer board: these are billable items that get absorbed if they are missing from the quote.
  • Bundling waterproofing into the tiling rate. It hides a compliance-critical cost, makes variations invisible, and creates arguments about what was included.
  • No follow-up. Most tilers never follow up a quote. A short message two to three days after sending the quote, referencing the job and not the price, is enough to stand out. For a follow-up framework, see our guide on following up unanswered quotes.
  • Vague exclusions. If the quote does not say "excludes demolition, plumbing and electrical", the customer assumes it is included. Be specific.

Frequently asked questions

Common questions

How much does a tiler charge per square metre in Australia?

Tiling labour rates in Australia typically sit between $45 and $150 per square metre before GST1. Most standard residential floor tiling falls in the $50 to $120 range. Wall tiling, mosaics and large-format tiles attract premiums because of the slower progress, more cuts and extra preparation. Always add materials (adhesive, grout, waterproofing membrane, trims) and waste on top of the labour rate.

Should I quote waterproofing separately or bundle it into the tiling price?

Always quote waterproofing as a separate line item. Waterproofing is a compliance-critical step governed by AS 3740:2021, and in several states it requires its own licence. Bundling it hides the cost, creates disputes if the scope changes, and makes it harder to document compliance. A separate waterproofing line protects your margin and gives the customer a clear picture of what they are paying for.

Do I need a licence to do tiling work in Australia?

It depends on the state. In QLD, tiling is a licensed trade contractor class under the QBCC. In NSW, a wall and floor tiling contractor licence is required for work where labour and materials exceed $5,000 including GST (per NSW Fair Trading). In VIC, tiling is not separately licensed but may fall under domestic builder registration above $16,000. SA, WA, TAS, ACT and NT fold tiling into broader building-work licensing with varying value thresholds. Waterproofing is licensed more consistently and often at a lower threshold than tiling. Check with your state authority before advertising as licensed.

What margin should a tiler aim for on residential jobs?

Healthy gross margins on residential tiling work typically sit between 25% and 40% (assumption: based on typical labour-to-materials ratios and waste factors across residential tiling job types, directional). Margins vary with the tile cost you supply, the complexity of cuts and the waterproofing scope. Small bathroom renos with client-supplied tiles carry higher margins than large-format floor installs where you source the tiles at cost.

How do I handle variations on a tiling job?

Log every variation in writing before you do the work. A tile change, an extra row of feature tiles, a waterproofing extension to a previously excluded area: each one gets a short written note with the price adjustment, signed or confirmed by the customer. Job management software like ServiceM8 or Tradify makes this a one-tap photo and note from site. Unlogged variations are the fastest way to erode margin on a tiling job.

What is the best quoting software for a tiler?

For sole-trader tilers, ServiceM8 is a strong fit: mobile-first, offline-capable, itemised quoting with digital sign-off and Xero integration, from around $29 per month6. Tradify suits multi-staff operations with catalogue-based quoting and a client portal, from around $35 per user per month7. Buildxact is better for tilers who regularly quote from plans and need material takeoff, from around $149 per month8. All three integrate with Xero or MYOB for invoicing.

Sources

  1. Yellow Pages, tiling cost guide, 2025, directional ↩
  2. NHK Tiling, 2025 pricing data, directional ↩
  3. NSW Building Commission, serious defects survey, 2023 ↩
  4. ServiceTasker, waterproofing cost guide, 2026, directional ↩
  5. Harvard Business Review, 2011, US-based, directional ↩
  6. ServiceM8 pricing page, 2026, directional ↩
  7. Tradify pricing page, 2026, directional ↩
  8. Buildxact pricing page, 2026, directional ↩

Figures are directional benchmarks for context, not quotes. Verify current rates for your own market before relying on them.

Mitchell Cross

Written by

Mitchell Cross

Founder, TradieBuddy AI

Mitchell Cross is the founder of TradieBuddy AI. He identifies the pain points and bottlenecks holding Australian trade businesses back and fixes them, improving profitability, efficiency and scalability. He builds the automations and systems that cut admin, capture missed leads, and connect a business's tools into one place, and writes these guides to share what actually moves the needle for tradies.