Price a painting job from your true cost per billable hour, not a going rate. Add wages, super, leave, insurance, vehicle and tools, divide by the hours you can actually bill, convert that to a rate per square metre, cost the paint from the data sheet spread rate, then price with a margin, not a markup.
Key takeaways
- Start from cost, not a going rate. In the illustrative build on this page, a painter on $36.00 an hour costs $67.57 per billable hour once super, leave, workers compensation, vehicle, tools and unpaid time are counted.
- A rate per square metre is your cost per billable hour divided by your own measured output per coat, multiplied by the coats, plus paint, then priced with a margin.
- Cost paint from the data sheet: Dulux lists a theoretical spread rate of 16 m² per litre for Wash & Wear 101 Low Sheen, and real jobs need a loss allowance on top.
- Markup is not margin: a 30% markup keeps only 23.1% of the price, so a 25% margin needs a 33.3% markup.
- Check the price after the job: in the worked example, 7 extra hours and a $30 materials overrun cut a 25% margin to 16.6%.
Price a painting job from your true cost per billable hour, not a going rate. Add wages, super, leave, insurance, vehicle and tools, divide by the hours you can actually bill, convert that to a rate per square metre, cost the paint from the data sheet spread rate, then price with a margin, not a markup.
Updated 14/10/2026. The dollar figures below are illustrative inputs and the arithmetic that follows from them. Swap in your own wage, output and paint prices before you quote.
What does one billable hour of painting really cost?
It costs far more than the wage. In the illustrative build below, a painter on $36.00 an hour costs the business $67.57 for each hour a customer actually pays for.
The inputs, all illustrative except the statutory ones:
- Paid hours. A 38-hour week over 52 weeks is 1,976 paid hours.
- Leave. Full-time employees get 4 weeks of annual leave and 10 sick days per year (Fair Work Ombudsman), plus public holidays, taken here as 10 days because the count varies by state.
- Time nobody pays for. Travel between jobs, paint shop runs, loading the ute and rained-off mornings, taken here as 5 hours a week.
- On-costs. The 12% super guarantee (ATO) and workers compensation at an illustrative 4% of wages. Ask your state scheme or insurer for your real premium rate.
- Not included. Award allowances and any annual leave loading. Check the award that covers your painters and add them in.
That leaves 1,672 hours on the tools and 1,452 billable hours a year. Spread the annual costs across those billable hours:
| Cost item | Annual cost (illustrative, AUD) | Per billable hour (illustrative, AUD) |
|---|---|---|
| Wages (all paid hours) | $71,136.00 | $48.99 |
| Super guarantee | $8,536.32 | $5.88 |
| Workers compensation | $2,845.44 | $1.96 |
| Vehicle running costs | $9,000.00 | $6.20 |
| Tools and equipment | $2,500.00 | $1.72 |
| Insurance, phone, software, accounting | $4,100.00 | $2.82 |
| True cost | $98,117.76 | $67.57 |
Super timing changed this year too. In the ATO's words: With the introduction of Payday Super, employers must pay super guarantee for each payday.
The rate is still 12%, but the money now goes out for each payday instead of once a quarter, so it belongs in the price and in the bank.
Price your own time the same way, using the wage it would cost to replace you on the tools. Super on a sole trader's own drawings is not compulsory, but leaving it out prices your retirement at nothing. Our guide to working out what to charge an hour runs an annual-budget version of this sum.
How do you turn that hourly cost into a rate per square metre?

Divide your hourly cost by the square metres you finish in an hour, multiply by the coats, add the paint, then apply your margin. The one input you cannot borrow from anyone else is your own output per coat.
- Labour per m²: coats ÷ your output per coat × your cost per billable hour.
- Paint per m²: coats ÷ the spread rate × a loss allowance × your price per litre.
- Rate per m²: labour plus paint, divided by one minus your target margin.
The table uses illustrative outputs of 18 m² an hour on walls and 15 m² an hour on ceilings, paint at $12 a litre for walls and $10 a litre for ceilings (ceiling paint assumed to spread at the same rate, so check its own data sheet), the 15% loss allowance explained in the next section, and a 25% margin.
| Surface | Output per coat (illustrative) | Cost per m², labour and paint (illustrative, AUD) | Rate per m² (illustrative, AUD) |
|---|---|---|---|
| Walls (two coats) | 18 m² an hour | $9.23 | $12.31 |
| Walls (three coats, strong colour change) | 18 m² an hour | $13.85 | $18.47 |
| Ceilings (two coats) | 15 m² an hour | $10.45 | $13.93 |
The three-coat row is there because the Dulux data sheet notes that some colours may need more than two coats, especially over a contrasting colour. Time your own output on three similar jobs before you trust a rate card, and price doors, windows and trim per item or per lineal metre in the same way.
How much paint should you price for a job?
Price litres from the manufacturer's data sheet, not from a guess at tins. Litres equal area × coats ÷ spread rate, plus a loss allowance, rounded up to the pack sizes you can buy.
The Dulux data sheet for Wash & Wear 101 Low Sheen (AUDU06253) lists a theoretical spread rate of 16 m² per litre and two coats. Treat that as a best case. Porous, rough or patched walls soak up more, and trays, cutting-in and leftovers take their share, so this page adds an illustrative 15% loss allowance.
For the 270 m² of walls in the worked quote below:
- Theoretical litres. 270 m² × 2 coats ÷ 16 = 33.75 L.
- With the loss allowance. 33.75 L × 1.15 = 38.81 L.
- What you buy. 40 L, as two 15 L cans and one 10 L can, sizes listed on the same data sheet.
Check the sheet for the exact product and sheen you are buying, because spread rates differ across ranges. Then cost the things that never appear on a tin: filler, tape, plastic, sandpaper and roller sleeves. Our guide to stopping losses on materials you forgot to charge for covers how those slip through.
Prep is labour, so price it as hours

Prep goes into the price the same way rolling does: as hours at your cost rate, shown on its own line. In the worked quote below it is 8 hours, or $540.56 at cost.
How many hours a surface needs is a site-walk judgement, and it swings widely on older homes. Our guide to quoting a repaint differently to a new build covers assessing surfaces, prep levels and lead paint, so this page sticks to the maths.
Is markup the same as margin?
No. Markup is a percentage added to cost, while margin is the share of the final price you keep, so the same dollars produce a smaller margin figure than markup figure.
The formulas are margin = markup ÷ (1 + markup), and markup = margin ÷ (1 minus margin). A painter who adds 30% to cost and believes they are keeping 30% is keeping 23.1%.
| Markup on cost, per cent (illustrative) | Margin you keep, per cent (illustrative) |
|---|---|
| 15% | 13.0% |
| 20% | 16.7% |
| 25% | 20.0% |
| 30% | 23.1% |
| 40% | 28.6% |
| 50% | 33.3% |
To keep a 25% margin, as the worked quote does, mark cost up by 33.3%, which is the same as dividing cost by 0.75. That margin has to carry what the hourly cost does not: quoting time, quotes you lose, callbacks, and profit for the business.
What should your minimum job charge be?

Set it so the smallest job still pays for the time you lose just turning up. A touch-up in a hallway carries the same drive, set-up and clean-up as a full room.
- Fixed time per job: travel 1 hour, set-up and pack-down 0.5 hours, washing out gear 0.5 hours.
- Add the shortest stint worth doing, say 3 hours, for 5 hours in all.
- Cost it: 5 hours × $67.57 = $337.85, plus $40 of consumables, is $377.85.
- Apply the margin: $377.85 ÷ 0.75 = $503.80 before GST.
Put the minimum on your quotes in plain words, and offer to bundle small jobs so the customer gets more done for the same call-out.
What does a fully worked painting quote look like?
Here is the whole method on one illustrative job: walls and ceilings inside an occupied three-bedroom home, two coats throughout. The inputs are 270 m² of walls, 90 m² of ceilings, the outputs and paint prices above, and a 25% margin.
Labour hours come from area × coats ÷ output: walls 270 m² × 2 ÷ 18 = 30 hours, ceilings 90 m² × 2 ÷ 15 = 12 hours. Each labour line is hours × $67.57, and materials are at your account price.
| Line item | Quantity (illustrative) | Cost (illustrative, AUD) |
|---|---|---|
| Prep: filling, sanding, masking | 8 hours | $540.56 |
| Walls, two coats | 30 hours | $2,027.10 |
| Ceilings, two coats | 12 hours | $810.84 |
| Set-up, pack-down and clean-up | 4 hours | $270.28 |
| Wall paint | 40 L | $480.00 |
| Ceiling paint | 15 L | $150.00 |
| Sealer undercoat for patches | 4 L | $60.00 |
| Consumables: tape, plastic, filler, sleeves | $140.00 | |
| Total job cost | $4,478.78 | |
| Price before GST | $5,971.71 | |
| GST | $597.17 | |
| Price including GST | $6,568.88 |
The price before GST is total cost ÷ 0.75, and GST of 10% (ATO) goes on last so it does not come out of your margin. As a charge-out labour rate, the $67.57 cost ÷ 0.75 works out at about $90.09 an hour before GST, with materials marked up on top.
Price also decides paperwork. In Queensland a job this size sits above the $3,300 QBCC licence trigger for painting, while in NSW standalone interior paintwork is exempt. Our guide to starting a painting business in Australia sets out the position in each state.
How do you check after the job whether the price held?
Compare what you quoted with what the job actually took, then work out the margin you really kept. Do it within a week, while timesheets and receipts are fresh.
Say the worked job above took 61 hours instead of 54 hours and materials came to $860 against the $830 quoted:
- Actual cost. 61 × $67.57 + $860 = $4,981.77.
- Margin kept. $5,971.71 minus $4,981.77, divided by $5,971.71, is 16.6%, not the 25% you priced.
- Break-even point. At this price and materials bill, the job stops paying anything at about 75.7 hours.
- Where it slipped. Compare prep, walls and ceilings with their own quote lines, because the fix is the output figure for that surface.
Seven extra hours cost about eight points of margin. Job apps such as ServiceM8, Tradify and Fergus can log time against a job, so record hours by quote line and update your output per coat after each job. For the wider habit, see our guide to knowing if you are making money on each job.
If you would rather have that quoted-versus-actual comparison built into the job app you already use, TradieBuddy AI sets up that kind of tracking, where your app allows it, and the first step is a free discovery call.
Common questions
Is a 30% markup the same as a 30% margin?
No. A 30% markup on $1,000 of cost gives a $1,300 price and a 23.1% margin (illustrative arithmetic: 0.30 ÷ 1.30). To keep 30% of the price you need a 42.9% markup, worked out as 0.30 ÷ 0.70.
Does the price of a painting job change whether I need a licence?
In some states, yes, because the licence trigger is the value of the work. The QBCC licenses painting over $3,300 in Queensland, NSW requires a licence over $5,000 (standalone interior paintwork is exempt), and WA requires registration for painting work of $1,000 or more within the Building Services Board's jurisdiction. Victoria, South Australia, Tasmania, the Northern Territory and the ACT have no standalone painter licence, though painting inside larger building work can bring in builder licensing. Check how your regulator values a job before you quote near a line.
Do I add GST to my painting price?
If you are registered for GST, yes: add 10% to the price before GST and show the GST-inclusive total on the quote. Registration is compulsory once your GST turnover reaches $75,000 (ATO). Work out cost, margin and your minimum charge before GST, then add GST last.
What output per hour should I use when I build my own rates?
Your own, measured. Log hours against three similar jobs in ServiceM8, Tradify or Fergus, divide the square metres by the hours for each coat, and use the slowest of the three until you have more data. The 18 and 15 square metres an hour on this page are illustrative inputs, not industry figures.
How often should I rerun my hourly cost?
At least once a year, and whenever a big input moves: a wage rise, a new vehicle, a workers compensation premium change or a jump in time nobody pays for. Payday Super started on 01/07/2026, so super is now paid for each payday at the same 12% rate. That is a cash-flow change rather than a rate change, but it is a good prompt to check the numbers.

